Industrial and infrastructure
Commercial gas purging, testing and large-bore pipework
Commercial gas purging and testing at an airport and in central London, and a 100mm stainless steel gas main with solenoid valve feeding four boilers and a gas cylinder.

The challenge
Large commercial gas installations have to be brought into service safely: purged, tested, certificated and, where the load demands it, fed by pipework and boosters sized well beyond a normal plant room.
What we did
Purging and testing to current standards on live commercial sites including an airport and central London premises, and the installation of a plant room solenoid valve with 100mm stainless steel gas pipework to feed four boilers and a gas cylinder.
The outcome
Gas installations certificated and in service, with the purge and test documentation the site operators and their insurers require.