Education · Portchester Community School · Portchester, Hampshire
Plant room strip-out and rebuild, Portchester Community School
Three ageing floor-standing boilers replaced with a four-boiler Ideal wall-hung cascade, new headers, pumps and a sealed floor, from strip-out to commissioning.

Before and after
Same room, one photo each, straight off the job
Before
AfterThe challenge
The school's plant room had reached the end of its life: three ageing floor-standing boilers, cramped flues and exposed services in a room that had been added to over the years rather than designed as a whole. The school needed reliable heat and hot water and a plant room that would not spring a surprise in term time.
What we did
Replacing like-for-like would have repeated the same problems. We surveyed the building and designed a full replacement: a four-boiler Ideal wall-hung cascade with new low-loss headers, pumps and controls. A cascade suits a school: it modulates down during quiet periods and holidays, and if one boiler needs attention the others carry the building. Wall-hung units freed floor space and made the room far easier to service.
The works were organised around term time with the school, and we handled the job from strip-out to commissioning and handover.
The outcome
A cleaner, safer and more efficient plant room: new pumps and controls, lagged pipework, a sealed floor and clear safety markings.
In the school's words: they organised the job completely from start to finish, and if any issues came up they quickly fixed them.